Ľutujeme, spoločnosť ponúkajúca danú pracovnú pozíciu ukončila zverejnenie ponuky na stránke.
Ďakujeme za porozumenie.
Zobraziť podobné ponuky
Ďakujeme za porozumenie.
Zobraziť podobné ponuky
Construction Project Design Specialist (Cable Task Force)
SE Služby inžinierskych stavieb, s.r.o.
Place of work
Slovakia, Nitra region, Mochovce 935 39, Mochovce Nuclear Power Plant, Units 3&4, District Levice, District Zlaté Moravce
Slovakia, Nitra region, Mochovce 935 39, Mochovce Nuclear Power Plant, Units 3&4, District Levice, District Zlaté Moravce
Contract type
full-time
full-time
Start date
asap
asap
Information about the position
Job description, responsibilities and duties
Key responsibilities:
Supervise completion of All Design and Engineering Activities Related to Electrical and I&C systems, equipment and cabling raceways layout, routing and wiring
Supervise the management process of Cable Pulling and Termination activities including issuing of Cards and Quality Documentation necessary to turnover to Commissioning
General Tasks:
• Supervise all engineering activities related to cable work with special focus to the existing two main contracts [PPA I007 and PPA Job02]
• Supervise all Piping I&C activities under PPA I007 and Job02
• Supervise all Engineering activities related to DEZ contract
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to Layout, Main Cable Trays, Secondary Cable Trays, Hermetic Cable penetration and Non-hermetic cable penetration
• Supervise ensurance the necessary input documentation required by PPA to perform the activities
• Supervise interface and coordinate with the Electrical Routing and Wiring team on all necessary actions related to required new holes and penetrations
• Supervise interface with Site technical office (STO) on all engineering emerging issues
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to Cable Routing
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to Wiring and Connection Diagrams
• Supervise ensurance the necessary input documentation required by PPA to perform Cabling activities is issued by contractors in accordance with project schedule. This interface is limited to ENEL SRI in case of inputs required for I007
• Supervise coordination and resolution of all interface issues between PPA engineering and contractor(s)
• Supervise ensurance of all output documentation from PPA I007 and Job02 are delivered in accordance with project schedule and/or as required by individual contractor(s)
• Supervise interface with STO on all Cable Pulling related activities
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to impulse pipe routing, instrument layout
• Supervise insurance the necessary input documentation required by PPA to perform the activities. This interface is limited to ENEL SRI in case of inputs required for I007
• Supervise All DEZ design related activities
• Supervise interface with STO on all impulse pipes and instrumentation related activities
• Supervise review of existing procedures with technical inspection, engineering and/or construction team
• Supervise introduction of necessary updates to further optimize the cable pulling and termination activities
• Supervise issuance of Cable Pulling Cards
• Supervise interface with Technical Inspection Team and following up on all Inspection and Test Plan´s steps
• Supervise implementation of requested changes/updates in Traceman to rectify the CPC findings based on input from Construction and/or STO
• Supervise issuance of Green Stamped Cards for Completed Cables
• Supervise coordination the issue of cable certificates for classified cables
• Supervise follow up with individual contractors on work completion documents submission and handover to Commissioning as necessary
Supervise completion of All Design and Engineering Activities Related to Electrical and I&C systems, equipment and cabling raceways layout, routing and wiring
Supervise the management process of Cable Pulling and Termination activities including issuing of Cards and Quality Documentation necessary to turnover to Commissioning
General Tasks:
• Supervise all engineering activities related to cable work with special focus to the existing two main contracts [PPA I007 and PPA Job02]
• Supervise all Piping I&C activities under PPA I007 and Job02
• Supervise all Engineering activities related to DEZ contract
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to Layout, Main Cable Trays, Secondary Cable Trays, Hermetic Cable penetration and Non-hermetic cable penetration
• Supervise ensurance the necessary input documentation required by PPA to perform the activities
• Supervise interface and coordinate with the Electrical Routing and Wiring team on all necessary actions related to required new holes and penetrations
• Supervise interface with Site technical office (STO) on all engineering emerging issues
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to Cable Routing
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to Wiring and Connection Diagrams
• Supervise ensurance the necessary input documentation required by PPA to perform Cabling activities is issued by contractors in accordance with project schedule. This interface is limited to ENEL SRI in case of inputs required for I007
• Supervise coordination and resolution of all interface issues between PPA engineering and contractor(s)
• Supervise ensurance of all output documentation from PPA I007 and Job02 are delivered in accordance with project schedule and/or as required by individual contractor(s)
• Supervise interface with STO on all Cable Pulling related activities
• Supervise monitoring and reviewing the activities performed by PPA I007 and Job02 related to impulse pipe routing, instrument layout
• Supervise insurance the necessary input documentation required by PPA to perform the activities. This interface is limited to ENEL SRI in case of inputs required for I007
• Supervise All DEZ design related activities
• Supervise interface with STO on all impulse pipes and instrumentation related activities
• Supervise review of existing procedures with technical inspection, engineering and/or construction team
• Supervise introduction of necessary updates to further optimize the cable pulling and termination activities
• Supervise issuance of Cable Pulling Cards
• Supervise interface with Technical Inspection Team and following up on all Inspection and Test Plan´s steps
• Supervise implementation of requested changes/updates in Traceman to rectify the CPC findings based on input from Construction and/or STO
• Supervise issuance of Green Stamped Cards for Completed Cables
• Supervise coordination the issue of cable certificates for classified cables
• Supervise follow up with individual contractors on work completion documents submission and handover to Commissioning as necessary
Employee perks, benefits
• great opportunity to act as a project team member on one of the biggest projects in Europe in these days;
• international experience in multicultural company;
• international experience in multicultural company;
Information about the selection process
The job position is hired for the branch of Slovenské Elektrárne a.s.
In case you are interested in this position, please send us your detailed CV in English language.
Thank you for contacting us. Only suitable candidates will be contacted back.
In case you are interested in this position, please send us your detailed CV in English language.
Thank you for contacting us. Only suitable candidates will be contacted back.
Requirements for the employee
Candidates with education suit the position
University education (Master's degree)
Language skills
English - Upper intermediate (B2)
Driving licence
B
Personality requirements and skills
• Education: Technical university degree
• Knowledge in engineering
• 5 years’ experience in electro area
• Language skills: English language: C1, Upper intermediate
• PC Skills: MS Office, Lotus Notes, IIS
• Soft skills: Initiative: Provides heads up on potential issues; highlight problems with design documentation, contractor implementation and/or work procedures; ability to communicate effectively; team player; intellectual curiosity; analytical thinking; active listening; time management
• Knowledge in engineering
• 5 years’ experience in electro area
• Language skills: English language: C1, Upper intermediate
• PC Skills: MS Office, Lotus Notes, IIS
• Soft skills: Initiative: Provides heads up on potential issues; highlight problems with design documentation, contractor implementation and/or work procedures; ability to communicate effectively; team player; intellectual curiosity; analytical thinking; active listening; time management
Advertiser
Brief description of the company
SE Služby inžinierskych stavieb, s.r.o. is subsidiary company of Slovenské elektrárne, a.s. that is 100% owner.
The scope of business of the SE Služby inžinierskych stavieb, s. r. o. is a provision of specialized services through skilled professionals to the Nuclear power plant MO34 Project, in the areas of engineering, construction, testing, project management, planning and quality control.
The scope of business of the SE Služby inžinierskych stavieb, s. r. o. is a provision of specialized services through skilled professionals to the Nuclear power plant MO34 Project, in the areas of engineering, construction, testing, project management, planning and quality control.
Number of employees
250-499 employees
ID: 2695808
Dátum zverejnenia: 20.10.2016
2016-10-20
lokalita: Slovakia, Nitra region, Mochovce 935 39, Mochovce Nuclear Power Plant, Units 3&4, District Levice, District Zlaté Moravce Pozícia: Design Engineer, Design Technician, Electrical Engineer, Electrical Engineering Technician, Power Engineer Spoločnosť: SE Služby inžinierskych stavieb, s.r.o.